Prepare to Drill

Читайте также:
  1. A. Listen to the description of the drilling process and fill in the missing words (no more than THREE words). The first word is given as an example.
  2. B) Choose any picture you like and prepare the description of this picture for your group-mates to guess.
  3. CHAPTER 8 Walton-Martinez Prepares The Chaining Scheme; Wilson-Donahue Rages At Phoenix Pavilion.
  4. Classify the responsibilities of a reservoir engineer and a drilling engineer into two groups.
  5. Commissioned, prepared, sprawled
  6. Drilling
  7. Drilling crew
  8. He paused, sun-flecked, holding up a bough, prepared to duck under it A spasm of terror set him shaking and he cried aloud.
  9. Terms and Vocabulary (Drilling Components)

Once the site has been selected, it must be surveyed to determine its boundaries and environmental impact studies may be done. Lease agreements, titles and right-of-way accesses for the land must be obtained and evaluated legally. Once the legal issues have been settled, the crew goes about preparing the land:

 

1. the land is cleared and levelled and access roads may be built;

2. because water is used in drilling, there must be a source of water nearby. If there is no natural source, they drill a water well;

3. they dig a reserve pit, which is used to dispose rock cuttings and drilling mud during the drilling process, and line it with plastic to protect the environment. If the site is an ecologically sensitive area, such as a marsh or wilderness, then the cuttings and mud must be disposed offsite –trucked away instead of placed in a pit.

 

Once the land has been prepared, several holes must be dug to make way for the rig and the main hole. A rectangular pit, called a cellar, is dug around the location of the actual drilling hole. The cellar provides a work space around the hole, for the workers and drilling accessories. The crew then begins drilling the main hole, often with a small drill truck rather than the main rig. The first part of the hole is larger and shallower than the main portion and is lined with a large-diameter conductor pipe. Additional holes are dug off to the side to temporarily store equipment – when these holes are finished, the rig equipment can be brought in and setup.

(Baker R. “A Primer of Oil Well Drilling”, 2001, Austin, Texas)

1. crown block 2. mast 3. monkeyboard 4. traveling block 5. hook 6. swivel 7. elevators 8. kelly 9. kelly bushing 10. master bushing 11. mousehole 12. rathole 13. backup tongs 14. drawworks 15. weight indicator 16. driller’s console 17. doghouse 18. rotary hose 19. accumulator unit 20. pipe ramp 21. pipe rack 22. substructure 23. mud return line 24. choke manifold 25. mud-gas separator 26. degasser 27. reserve pit 28. mud tanks 29. desilter 30. desander 31. centrifuge 32. mud pumps 33. dry mud components storage 34. water storage 35. engines and generators 36. blowout preventer stack

 


Fig.1. Drilling rig components




Дата добавления: 2015-09-10; просмотров: 87 | Поможем написать вашу работу | Нарушение авторских прав

USING OIL | Lead-in | Define the following terms with their similar meaning in Russian. | A. Listen to the description of the drilling process and fill in the missing words (no more than THREE words). The first word is given as an example. | WORDLIST | Terms and Vocabulary | Types of Oil Wells | Lahee classification | WORDLIST | Fill in the gaps with the most suitable words or terms from the text. |


lektsii.net - Лекции.Нет - 2014-2025 год. (0.005 сек.) Все материалы представленные на сайте исключительно с целью ознакомления читателями и не преследуют коммерческих целей или нарушение авторских прав